PROJECT: Village at Stephen’s Woods
Location: Arnold, MD
Start Date:
Completion Date: Early 2016
C.J. Miller began work on this 24-single family home development by stripping topsoil from the area to prepare for a future roadway and then grading the roadway into the development. Swales were installed on each side of the road leading into the job. C.J. Miller is preparing to install utilities, including water connections and fire hydrants, sewer connections to each home and a storm drain. The crew will then install curbs and gutters as well as fine grade and pave roads.